Ray is making progress with the rigs for the Octave prototype. The design uses a simple method for cantilevering the cranes from the upper mast tubes. After drilling, fitting, and bonding, carbon tow is used to prevent splitting. The mastheads are filled with low density filler mainly to keep water out. This system eliminates all fittings […]

